Johnny and his team remodeled this house interior in Mountain Brook Alabama.
Scope of Work
- Closet doors- Demo existing closet doors and install new Masonite hollow core french closet doors x 2
- Hardwoods- Demo entire upstairs carpet, install 2 1/4 No. 1 oak hardwoods, sand, stain, finish, and install stained quarter round
- Staircase- Demo existing stairs, level with shims, install new oak treads, primed risers, sand, stain, finish, and paint risers to match trim
- Demoltion- Demo entire bathroom
- Framing- Install framing as needed to accommodate design
- Electrical- Install up to 5 can lights, rewire bathroom with adequate amount of plugs, and relocate switches as needed
- Plumbing- Rough in and trim out toilet, shower, 2 x sinks (note- there will be curb at shower door with standard drain)
- Hvac- Install new vent fan
- Sheetrock- Install and finish as needed
- Trim/carpentry- Install misc trims as needed
- Cabentry- Install Aspect Full overlay Hanover door style painted. Includes mirror medicine cabinets
- Paint- Prep and paint all areas effected
- Tile- Install 4x8 tiled shower with Niche shelf, install main bath floor
- Hardware- Install bath hardware
- Prep and paint 1st floor, 2nd floor, 3rd level stairwell ceilings only
- Demo existing deck and haul off waste
- Take handrails off and repurpose
- Install new deck framing and 1x5.5 Grooved Trex select Composite decking
- Build small set of steps
- Install existing iron handrail
- Prep and paint iron handrail
- Demolition- Demo entire kitchen
- Flooring- Install Hardwoods in main kitchen
- Tile- Install tile in pantry
- Electrical- Re-wire kitchen as drawn, install undercabinet lights, install up to 6 can lights, install appliances
- Plumbing- Re-plumb as drawn, install appliances, range to be gas
- HVAC- Inspect and connect down draft
- Kitchen Cabinets - Install Aspect Semi Custom Cabinets with dovetailed softclose drawers with double trash and rollout shelves
- Countertops - Natural stone group 1 standard edge detail with *stainless steel sink included
- Pantry Shelving- Install 5 Melimine shelves with support brackets
Sand, stain, and finish hardwood throughout main level.
- Demo and haul off existing
- Take existing storm door off and reinstall after new door is in place
- Touch up Painting around new opening
4th Floor ledge
- Demo and patch ledge on 4th floor
Downstairs
- Demo carpet and haul off
- Install vinyl plank flooring
- Demo existing drop ceiling tiles and replace with new to match existing
Other Remodeling Work
- Remove sconce lights x 2 in dining room
- Repair door and install toilet in hall half bathroom
- Install Wine fridge in living room
- Install stained glass in existing pantry door
- Patch spot in bedroom where currently security pad is located
- Demo bathroom door, supply new door, make framing wider, Door Installation, install Sheetrock and trim
- Install basement steps
- Demo powder bath counter, toilet and haul off trash
- Demo upstairs hall bath counter, toilet and haul off trash
- Install upstairs hall bath counter and sink
- Add for hookups in downstairs powder and upstairs hall bath toilets and sinks
- Remove remaining wallpaper and prime walls with wall paper
- New sink disposal and plumbing parts for shower